Step 1 — Match the license to the work
Pure cabinet refinishing or installation doesn’t require a state license in Florida — but a remodel touching structure, electrical, or plumbing does (CGC, CBC, or CRC, plus licensed specialty trades). Decide which side of the line your project falls on, then verify the license at myfloridalicense.com: Current/Active status, correct license type, business name matching the proposal. Full walkthrough in our Florida license guide.
Step 2 — Verify insurance yourself
- Ask for current general liability and workers’ compensation certificates
- Call the insurer to confirm the policy is active — certificates can be faked or expired
- If the crew has no employees, Florida still requires workers’ comp exemptions to be documented — “we’re all 1099” isn’t a plan if someone gets hurt in your kitchen
Step 3 — Check real references
- Get three recent Tampa Bay references — not just “we’ve done hundreds of kitchens”
- Call them. Ask about schedule, surprises, final price vs. quote, and whether they’d hire the company again
- Ask to see a finished kitchen in person if possible; photos hide the details
- Check the DBPR complaint/discipline history on the license record — a pattern matters more than one old resolved complaint
Step 4 — Get a real contract
A legitimate remodeler’s contract includes:
- Full legal business name, address, phone, and license number
- Detailed scope of work: exactly what's being done, with named materials (cabinet line, countertop material, fixture models)
- Line-item pricing — cabinets, counters, electrical, plumbing, labor shown separately
- Start and completion dates (or a realistic range), plus what happens if the schedule slips
- Payment schedule tied to milestones — never 100% upfront
- Who pulls permits, and confirmation that inspections will happen
- Change-order process in writing (how extras get priced and approved)
- Workmanship warranty terms, separate from manufacturers’ warranties
- Cleanup expectations and protection of the rest of your home
Step 5 — Structure payments around milestones
- Deposit: enough to secure the schedule and order materials — often 10–30%, not 50%+
- Progress payments: at demo completion, rough-in sign-off, cabinet installation, countertop installation
- Final payment (10–15%): held until the punch list is complete and you’ve done a final walkthrough
- Lien releases: get them with each payment on larger jobs — they prove subs and suppliers have been paid and can’t lien your home
Red flags — walk away
- Demands full payment (or a huge deposit) before any work
- No license number on the proposal for work that requires one
- Asks you to pull the permit as an “owner-builder” for their crew
- No written contract — “we work on a handshake”
- Can’t or won’t provide insurance certificates
- High-pressure “sign today” discounts
- The person selling the job isn’t the company on the license (license borrowing)
- Way cheaper than every other bid — the scope is different, or the shortcuts are
Where to complain if it goes wrong
If a licensed contractor abandons the job, does defective work, or violates the contract, file a complaint with the DBPR — and Florida’s Construction Recovery Fund can compensate homeowners harmed by licensed contractors in certain circumstances. None of these protections exist if you hired unlicensed. That’s the real value of the license: it’s your recourse.
Start with written quotes
Tell us about your project and we’ll connect you with Tampa kitchen pros for written, no-pressure quotes — then run them through this checklist.
Vetting FAQs
What are the biggest red flags when hiring a kitchen remodeler?
Demanding 100% payment upfront; no license number on the proposal for work that requires one; asking you to pull an 'owner-builder' permit for their crew; no written contract; no proof of general liability or workers' comp insurance; and pressure to 'sign today for a discount.' Any one of these is enough to keep looking.
How many quotes should I get for a kitchen remodel?
At least three, and compare scopes — not just totals. A $35,000 quote and a $55,000 quote may describe different projects (reface vs. replace, stock vs. semi-custom cabinets). Ask each bidder for a line-item breakdown: cabinets, counters, electrical, plumbing, and labor separately.
Should I check references, and what do I ask?
Yes — ask for three recent local references and actually call them. Ask: did the crew show up when promised? How did they handle surprises? Was the final price close to the quote? Would you hire them again? Also drive by a finished job if they'll let you — photos only show the good angles.
What payment schedule is normal for a kitchen remodel?
Tied to milestones, never 100% upfront. A common structure: a deposit to secure the schedule and order materials (often 10–30%), payments at demo completion, rough-in, cabinet install, and countertop install, with a meaningful final payment (10–15%) held until the punch list is done and you're satisfied. Get lien releases with each payment on larger jobs.
This guide is general information as of 2026, not legal advice. Verify licensing and insurance directly with the Florida DBPR and the insurer before hiring.